Tordesillas, Spain Tordesillas

In the portfolio since

30/10/2020

Remuneration

PPA

Production

72 GWh of green electricity per year

Status

On the grid


About the solar park

The Tordesillas photovoltaic park, which was commissioned in September 2021, is located on the Spanish high plain northwest of Madrid 700 metres above sea level. It converts solar energy from around 10 hours of sun per day into renewable power. 
 
Tordesillas has a tracked carrier system that ensures optimal use of the available solar energy – and thus aims for a total annual output of 73 GWh. A ten-year PPA was agreed to secure power purchases for the long term.

Nahaufnahme eines
  Solarpanels des klimaVest-Assets: Solarpark Tordesillas.