Tordesillas, Spain Tordesillas
In the portfolio since
30/10/2020
Remuneration
PPA
Production
72 GWh of green electricity per year
Status
On the grid
About the solar park
The Tordesillas photovoltaic park, which was commissioned in September 2021, is located on the Spanish high plain northwest of Madrid 700 metres above sea level. It converts solar energy from around 10 hours of sun per day into renewable power.
Tordesillas has a tracked carrier system that ensures optimal use of the available solar energy – and thus aims for a total annual output of 73 GWh. A ten-year PPA was agreed to secure power purchases for the long term.